SEUIR Repository

False alarms in shewhart joint monitoring schemes

Show simple item record

dc.contributor.author Razmy, A. M.
dc.contributor.author Habsi, Widath Rashid Saif Al-
dc.date.accessioned 2019-03-26T03:09:10Z
dc.date.available 2019-03-26T03:09:10Z
dc.date.issued 2018-11-15
dc.identifier.isbn 9789556271362
dc.identifier.uri http://ir.lib.seu.ac.lk/handle/123456789/3486
dc.description.abstract Shewhart, Cumulative sum and exponentially weighted moving average control charts are commonly used to monitor the process mean and variance in quality control. Traditionally, the mean and variance charts are plotted and evaluated separately and this can cause an inflated false alarm rate. Sometimes special causes in the industry can result changes in both mean and variance. Therefore, joint monitoring schemes for mean and variance have been developed for simultaneously monitoring the mean and variance of a process. Currently there are four Shewhart joint monitoring scheme available for monitoring mean and variance simultaneously. Gan discussed two types of Shewhart joint monitoring scheme one with rectangular control chart and the other with elliptical control region (Gan, 1995). Chen and Cheng proposed another Shewhart joint monitoring schemes called Max chart (Chen and Cheng, 1998). Shewhart distance scheme was proposed by Razmy (Razmy, 2005). In all these schemes, a state which is having very smaller variance when the mean is in-control, is taken as an out-of-control situation and issues false alarm. Actually this state is very desirable to the process. This study aims to find the false alarm rate for the existing joint monitoring schemes for different shifts in mean and variance. In addition, an attempt is made to introduce a new joint monitoring schemes with a new control region to avoid the false alarms. en_US
dc.language.iso en_US en_US
dc.publisher Faculty of Applied Science, South Eastern University of Sri Lanka en_US
dc.relation.ispartofseries Abstracts of the 7th Annual Science Research Sessions (ASRS) – 2018;39
dc.subject Average run length en_US
dc.subject False alarm en_US
dc.subject Joint monitoring en_US
dc.title False alarms in shewhart joint monitoring schemes en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

  • ASRS - FAS 2018 [39]
    ABSTRACTS OF THE 7TH ANNUAL SCIENCE RESEARCH SESSIONS (ASRS) – 2018 on “Interdisciplinary Scientific Research for Inclusive Development” November 15th, 2018 Faculty of Applied Sciences South Eastern University of Sri Lanka Sammanthurai

Show simple item record

Search SEUIR


Advanced Search

Browse

My Account